Question Bank › After the books closed

After the books closed

After the books closed: the quarter's biggest news happened too late to be in the numbers

Calls Tested
497
Answered YES
13
Hit Rate
2.6%
rare by design

Independence Realty Trust, Inc. (IRT) — this company's answers

NO on the Q2 2018 call 2018-08-02 B
The model's full reasoning — Q2 2018 call → NO我们根据问题要求,判断管理层是否报告了最重要的积极发展发生在报告期后期或之后,且管理层自己指出了这种时间差,并认为这些发展是数字未反映的真正故事。 在通话中,管理层提到了价值增值计划(value-add program),特别是Phase 1和Phase 2。他们提到Phase 1已全面展开,将在明年年初完成;Phase 2最近开始建设。他们提到翻新单元正在以比完成更快的速度出租,有约100个预租单元积压。翻新单元平均租金溢价186美元/月,回报率21%。这些是积极发展,但时间上,Phase 2是“最近开始”的,Phase 1正在进行中。管理层没有明确说这些发生在报告期后期或之后,而是说“我们最近开始建设Phase 2”,但这是指在报告期内或之后?他们提到“截至今天”有100个预租单元,但未明确时间点。 另外,他们提到在季度后收购了两个社区(Tampa和Columbus),这是“subsequent to quarter end”,即季度后。但这是收购,不是运营结果。管理层说这些收购是资本回收计划的一部分,但未强调这些收购对报告期结果的影响。 关键点:管理层是否将最重要的积极发展定位为发生在报告期后期或之后,并认为报告期数字未反映它们?他们提到Q3指引中,新租约增长6%,续租5.3%,但这是Q3的早期数据,不是报告期内的。他们提到Q2新租约增长1.6%,续租3.6%,这是报告期内的。 管理层强调价值增值计划是长期增长的关键,但未明确说这些计划的效果在报告期内未体现。他们提到“短期痛苦带来长期增长”,但未说报告期数字未反映这些发展。 关于收购,他们明确说“subsequent to quarter end”收购了两个社区,但这是资本回收的一部分,且他们提到将用这些收购来扩大规模,但未说这些收购对报告期结果有影响。 问题要求:管理层是否报告了最重要的积极发展发生在报告期后期或之后,且管理层自己指出了时间差,并认为这些发展是数字未反映的真正故事?从通话看,管理层没有明确说“这些发展发生在报告期后期,所以报告期数字未反映它们”。他们提到价值增值计划正在进行,但未说其效果未反映在报告期数字中。他们提到Q3早期数据强劲,但那是下一季度。 因此,答案应为NO。

← Back to the full IRT analysis

Show the exact prompt the model was given
Using ONLY the supplied earnings call transcript and no outside information: On this call, does management report that the MOST IMPORTANT POSITIVE DEVELOPMENTS of the period happened SO LATE IN THE REPORTED PERIOD, OR SHORTLY AFTER IT ENDED, that the results being presented contain little or none of their effect — with management itself marking the timing? Answer YES when management's own words convey, in whatever form fits the business, ONE coherent situation with BOTH halves present: (1) LATE-BREAKING, CONCRETE POSITIVE EVENTS. Management points to specific favorable developments that actually occurred near the end of the reported period or in the weeks since it closed — real events, not hopes or pipeline. The events may take whatever form fits the industry: a contract, order, customer, or program signed or won late in the period or after quarter-end; a facility, location, product, or service that opened, launched, or shipped its first volumes in the final stretch or just afterward; an approval, certification, or qualification obtained late that has already begun converting into business; a large customer that went live, began ordering, or expanded right at the close or since; an acquisition or capability completed at or after period-end that is now operating. What matters is that management itself anchors the timing — saying in substance 'late in the quarter,' 'in the final weeks,' 'at the very end of the period,' 'since quarter-end,' 'subsequent to the close,' 'just after the period ended,' or equivalent — for events that are described as done or now happening, not merely expected. (2) MANAGEMENT TREATS THEM AS THE REAL STORY THE NUMBERS MISSED. Management conveys, directly or plainly in substance, that because of this timing the reported results reflect little or none of these developments — and treats them as consequential to where the company is now heading, for example by discussing how they will contribute in coming periods, how the company is now delivering or ramping them, or by contrasting the period's reported figures with the level of business the company is already doing as it exits. The late events should be presented as meaningful relative to the company's current size — capable of changing its trajectory — rather than as routine items in a long list. Answer NO if the period's positive developments are described as spread across the quarter in the ordinary way, with no emphasis on late or post-period timing. NO if the late-dated items are only letters of intent, negotiations, pipeline, expected signings, or events still contingent on approvals, financing, or decisions not yet made. NO if the late events are routine in scale for this company — the normal cadence of wins or openings it always reports — with no sense that they change its level of business. NO if management mentions timing only as an excuse for weak results without concrete late-arriving positives now in hand. NO if the post-period mention is a boilerplate subsequent-events disclosure that management does not connect to the company's trajectory. NO if the timing framing appears only in an analyst's question or model that management does not itself affirm. Use only the supplied transcript. Answer only YES or NO.

Companies that answered YES

TickerCompanyCallDateCall grade
ASM Avino Silver & Gold Mines Ltd. Q4 2023 2024-03-21 C+
KOPN Kopin Corporation Q4 2023 2024-03-14 C+
SCPH scPharmaceuticals Inc. Q3 2023 2023-11-08 B
NBTX Nanobiotix S.A. Q2 2023 2023-09-27 D
SWBI Smith & Wesson Brands, Inc. Q1 2023 2022-09-08 C+
YMM Full Truck Alliance Co. Ltd. Q2 2022 2022-08-25 C+
VNRX VolitionRx Limited Q1 2022 2022-05-12 F
OPK OPKO Health, Inc. Q1 2022 2022-05-09 D
BFIN BankFinancial Corporation Q1 2022 2022-05-06 A
RNW ReNew Energy Global Plc Q2 2022 2021-11-18 C
BFI BurgerFi International, Inc. Q3 2021 2021-11-12 C
LIND Lindblad Expeditions Holdings, Inc. Q2 2017 2017-08-06 C
PLAB Photronics, Inc. Q2 2017 2017-05-17 C+

How the model reasoned

OPK · Q1 2022 → YESThe question is: Does management report that the MOST IMPORTANT POSITIVE DEVELOPMENTS of the period happened SO LATE IN THE REPORTED PERIOD, OR SHORTLY AFTER IT ENDED, that the results being presented...YES The transcript shows management treating the ModeX acquisition (announced and closed on the call date, May 9) and the Sema4/GeneDx deal (closed April 29) as major positive developments that occurred after the Q1 period ended. These are framed as key steps toward unlocking value and are highlighted as the "exciting announcement" that changed the call format.
RNW · Q2 2022 → YESThe question is: Does management report that the MOST IMPORTANT POSITIVE DEVELOPMENTS of the period happened SO LATE IN THE REPORTED PERIOD, OR SHORTLY AFTER IT ENDED, that the results being presented...YES The transcript shows management explicitly marking the timing of key positive developments: 400 MW commissioned "since the end of the quarter" (bringing operating capacity to 7 GW today, with another 400 MW scheduled "over the next couple of weeks"), plus the completed Telangana acquisition adding 260 MW.
ASM · Q4 2023 → YESThe question is: Does management report that the MOST IMPORTANT POSITIVE DEVELOPMENTS of the period happened SO LATE IN THE REPORTED PERIOD, OR SHORTLY AFTER IT ENDED, that the results being presented...

More from the question bank

Bought the seat, waiting for the ridePriced like the old business, running like aCaught under-prepared by good newsTempo shift: the rhythm of the business has Position doing the winningThe new engine is already turningAll questions →
Not investment advice. Artul.ai publishes AI-generated earnings-call quality grades and expected-volatility estimates — never buy or sell recommendations. We tested over 1,600 predictive hypotheses against 165,000 transcripts; the honest result, including what failed, is documented in our methodology.