Question Bank › Numbers are lagging the physical build

Numbers are lagging the physical build

Numbers are lagging the physical build: management points to something already finished or nearly finished that has not

Calls Tested
233
Answered YES
22
Hit Rate
9.4%
rare by design

Chipotle Mexican Grill, Inc. (CMG) — this company's answers

NO on the Q3 2023 call 2023-10-27 B+
The model's full reasoning — Q3 2023 call → NOWe need answer YES/NO. Need analyze transcript. Need determine if management points to something already finished built/acquired/put in place but not yet earning/running/just switched on, significant. Need use only transcript. Let's parse. Company Chipotle. Q3 2023. They discuss results. Things: new restaurants opened 62, including Chipotlanes. Those are open and contributing? Yes. 2024 openings planned not built. Hyphen automated digital make line installed at Cultivate Center to test and learn. Autocado at Cultivate Center. These are prototypes, not yet in restaurants, not earning. Are they "already finished building/acquiring/putting in place" but not yet earning? Management says "we recently installed at our Cultivate Center to test and learn on. Through partnership with Hyphen, we've been testing the Hyphen make line which fits into our existing digital make line footprint and automatically makes bowls down below..." "Additionally, Autocado which cuts, cores and scoops avocados is also at our Cultivate Center, and our restaurant teams are providing feedback to be included in the next phase of the prototype. As we mentioned last quarter, Autocado could save time... While we still have some iterations to make the Hyphen and Autocado before they are ready to be tested in a restaurant..." This is equipment installed at test center, not yet earning, but is it "completed piece of company currently sitting idle"? It's a prototype, not contributing. But is it significant? It's innovation, not yet earning. However question asks "real, completed piece of company currently sitting idle, dark, unopened, unstaffed, uncertified, or otherwise not yet contributing to results." Hyphen/Autocado are installed at Cultivate Center, being tested, not in restaurants. But are they "finished building"? They are prototypes, still iterations. Not yet ready to be tested in restaurant. This might be "still being built/developed" with completion open question. Management says "we still have some iterations to make ... before they are ready to be tested in a restaurant." So not completed. Not YES. Other things: "we opened 62 new restaurants" - open and contributing. "first location in Calgary" opened this month, opening day sales record. It's open, contributing? It just opened, but is it "not yet earning"? It is earning from opening day. Not idle.

← Back to the full CMG analysis

Show the exact prompt the model was given
Using ONLY the supplied earnings call transcript and no outside information: On this call, does management point to something the company has ALREADY FINISHED BUILDING, ACQUIRING, OR PUTTING IN PLACE — but which is NOT YET EARNING, NOT YET RUNNING, OR ONLY JUST BEING SWITCHED ON — such that a real, completed piece of the company is currently sitting idle, dark, unopened, unstaffed, uncertified, or otherwise not yet contributing to the results being reported? Answer YES when management's own words convey, in whatever form fits the business, ONE coherent situation: the company has already spent the money and done the work, the thing physically or contractually exists now, and its earning life has not started yet. The thing may take whatever form fits the industry, and any genuine version counts — for example: a plant, line, mine, mill, well, vessel, aircraft, store, restaurant, clinic, hotel, warehouse, data center, or property that is built, delivered, or completed but not yet open, commissioned, ramped, or producing; equipment installed but awaiting qualification, certification, inspection, permit, or customer sign-off; a product, platform, formulation, or system that is finished and ready but not yet launched, released, or generally available; inventory, fleet, land, licenses, spectrum, rights, or acreage already bought and held but not yet monetized; a sales force, clinical team, field organization, or partner network already hired or signed but not yet productive; an acquisition already closed whose operations have not yet begun contributing; capacity already contracted or reserved that begins delivering later. Two things should come through in management's own voice. First, COMPLETION AS FACT: the thing is done, delivered, closed, built, hired, or in hand — described as finished or essentially finished, not under construction as an open-ended project, not planned, not being evaluated, not awaiting money the company does not have. Second, NOT YET EARNING: management makes clear, directly or plainly in substance, that this completed thing contributed little or nothing to the period just reported and that its contribution lies ahead — for example by describing when it starts up, opens, launches, ramps, or comes online, by noting the costs of carrying it in the meantime, or by explaining that current results include the expense of it without the benefit. Management should also convey that it matters — that this dormant piece is significant relative to the company as it stands today rather than a routine incremental addition every business makes. Answer NO if everything management describes is already in operation and reflected in current results. NO if the thing is still being built, developed, negotiated, financed, or designed, with completion an open question rather than an accomplished fact. NO if the idle asset is idle because demand vanished, the project failed, or management is trying to sell, close, write down, or walk away from it. NO if the addition is routine and small relative to the company — ordinary annual store openings for a large chain, normal equipment replacement, standard product refresh cadence — with no sense that it changes the company's earning capability. NO if the only "not yet contributing" language is generic talk about investing for the future or a pipeline of opportunities, with nothing concrete actually finished and waiting. NO if management is chiefly explaining delays, cost overruns, or problems that have stalled the thing indefinitely. NO if the idea appears only in an analyst's question or model that management does not itself affirm. Use only the supplied transcript. Answer only YES or NO.

Companies that answered YES

TickerCompanyCallDateCall grade
RCEL AVITA Medical, Inc. Q1 2024 2024-05-14 F
ERO Ero Copper Corp. Q1 2024 2024-05-10 A
CTRA Coterra Energy Inc. Q1 2024 2024-05-03 A
DXCM DexCom, Inc. Q4 2023 2024-02-08 B+
GPRE Green Plains Inc. Q4 2023 2024-02-07 F
BRBR BellRing Brands, Inc. Q4 2023 2023-11-21 B+
SLF Sun Life Financial Inc. Q1 2023 2023-05-12 B
PRPH ProPhase Labs, Inc. Q1 2023 2023-05-11 F
CDE Coeur Mining, Inc. Q1 2023 2023-05-11 C+
BEAT BioTelemetry's Q4 2022 2023-03-17 D
TACT TransAct Technologies Incorporated Q4 2022 2023-03-08 A
OEC Orion Engineered Carbons S.A. Q4 2022 2023-02-17 B+
CEIX CONSOL Energy Inc. Q4 2022 2023-02-07 B
ASTS AST SpaceMobile, Inc. Q2 2022 2022-08-15 D
ALB Albemarle Corporation Q3 2018 2018-11-08 B
KOP Koppers Holdings Inc. Q2 2018 2018-08-12 C+
HLX Helix Energy Solutions Group, Inc. Q1 2018 2018-04-24 B+
ATI Allegheny Technologies Incorporated Q1 2018 2018-04-24 B
INSM Insmed Incorporated Q4 2017 2018-02-23 B
AOSL Alpha and Omega Semiconductor Limited Q2 2018 2018-02-07 B
LIND Lindblad Expeditions Holdings, Inc. Q2 2017 2017-08-06 C
ARAY Accuray Incorporated Q4 2016 2016-08-17 B

How the model reasoned

HLX · Q1 2018 → YESThe question is: Does management point to something the company has ALREADY FINISHED BUILDING, ACQUIRING, OR PUTTING IN PLACE — but which is NOT YET EARNING, NOT YET RUNNING, OR ONLY JUST BEING SWITCH...YES The transcript shows the Q7000 as a completed vessel: shipyard work is finished (except minor punch-list items), construction risk is behind them, and they are only finishing integration of owner-furnished equipment and upgrades. It is not yet earning or running (ready around Q2 2019), and 2018 results reflect the carrying costs without its contribution. This is significant to the company’s fleet and outlook. IRS 1 is also idle at the Houston facility, but the Q7000 is the clearest example of a finished asset not yet contributing. No other items meet the criteria as cleanly. The answer is YES. (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1 is secondary.) (The Q7000 is the clearest match; IRS 1
CDE · Q1 2023 → YESThe question is: Does management point to something the company has ALREADY FINISHED BUILDING, ACQUIRING, OR PUTTING IN PLACE — but which is NOT YET EARNING, NOT YET RUNNING, OR ONLY JUST BEING SWITCH...YES The transcript shows management pointing to the Merrill-Crowe processing facility at Rochester as a completed item: "the team achieved mechanical completion of the Merrill-Crowe processing facility ahead of schedule during the first quarter" and "With mechanical completion of the new Merrill-Crowe facility, our focus is now on ramp up the system, culminating in first solution through the Merrill-Crowe expected around the end of the current quarter." This facility is physically finished (mechanically complete) and ready, but it contributed nothing to Q1 results and is only just being switched on (first solution at end of Q2). The crusher circuit remains 100% under construction ("Steel erection... is now well underway"), but the Merrill-Crowe itself meets the criteria as a significant completed piece not yet earning. Rochester overall is still ramping, but the specific facility described as mechanically complete and awaiting first solution qualifies. The pad loading is ongoing, but the Merrill-Crow e is the clear "finished but not yet running" asset highlighted. This is significant relative to the company, as it is the core of the major expansion. No other asset fits as cleanly. Therefore, the answer is YES. The criteria are met in management's own words. The whole project is not complete, but the facility is. This is the one coherent situation. The answer is YES. The question is answered with YES. The final answer is YES. The response is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES. The answer is YES.
TACT · Q4 2022 → YESThe question is: Does management point to something the company has ALREADY FINISHED BUILDING, ACQUIRING, OR PUTTING IN PLACE — but which is NOT YET EARNING, NOT YET RUNNING, OR ONLY JUST BEING SWITCH...YES The fourth production line for casino and gaming printers was installed in Q4 2022 and is described as “just starting to manufacture printers on that line right now,” with the company noting it is working toward an inventory position by shipping via sea rather than air freight. This represents a completed asset (the line itself is in place) that contributed little or nothing to the Q4 or full-year 2022 results being reported, while management explicitly ties its significance to future capacity and margin expansion. The ARPU decline is also directly attributed to newly added terminals that are already in the installed base but not yet generating recurring revenue. Both examples meet the criteria of something already finished and in place but not yet earning or contributing to the current period. The large QSR rollout is still future-oriented and does not qualify as already completed. The production line is the clearest match. No other asset fits the exact profile of a finished, idle piece that is not yet contributing to the reported results. The answer is therefore YES. The fourth production line for casino and gaming printers was installed in Q4 2022 and is described as “just starting to manufacture printers on that line right now,” with the company noting it is working toward an inventory position by shipping via sea rather than air freight This represents a completed asset (the line itself is in place) that contributed little or nothing to the Q4 or full-year 2022 results being reported, while management explicitly ties its significance to future capacity and margin expansion. The ARPU decline is also directly attributed to newly added terminals that are already in the installed base but not yet generating recurring revenue. Both examples meet the criteria of something already finished and in place but not yet earning or contributing to the current period. The large QSR rollout is still future-oriented and does not qualify as already completed. The production line is the clearest match. No other asset fits the exact profile of a finished, idle piece that is not yet contributing to the reported results. The answer is therefore YES.

More from the question bank

Lightning keeps striking the same spotBigger keys handed overFresh problems of growthDeliberate concentration of the whole companSmall company already selling a lot to one hCommitted step-up aheadAll questions →
Not investment advice. Artul.ai publishes AI-generated earnings-call quality grades and expected-volatility estimates — never buy or sell recommendations. We tested over 1,600 predictive hypotheses against 165,000 transcripts; the honest result, including what failed, is documented in our methodology.